Installation of 87 ton heavy transformer

Specifications

Weight: 87 tons

Location

Beveren. Under high-voltage cables.

Execution

The transformer weighing 87 tons was delivered using the SPMT. At the location, it was unloaded using our hoisting system. The difficulty lay in the construction of the transformer on a site that was located under numerous high-voltage cables. The transformer was then set onto the rails and lifted into its final spot.